Legionella Risk Assessment and Water System Checks Audit - Care Homes

Answered 0 / 31(0% complete)

Score

0%

N/A counts as Yes (full credit). Unanswered reduces the score until completed.

Breakdown

0 Yes 0 No 0 N/A 31 Unanswered

0%100%

Answers Overview

0%Score (Yes + N/A)
Yes
0
No
0
N/A
0
Unanswered
31

Questions

0/31 answered
  • Q1 | Unanswered

    Is there a current and comprehensive Legionella risk assessment carried out by a competent person or external contractor?

    Supporting Notes
    No notes yet.
    Notes are stamped with your name, date and time.
  • Q2 | Unanswered

    Is the risk assessment reviewed annually or when significant changes to the water system occur (e.g., plumbing work, occupancy changes)?

    Supporting Notes
    No notes yet.
    Notes are stamped with your name, date and time.
  • Q3 | Unanswered

    Is there a named person responsible for Legionella risk management within the service?

    Supporting Notes
    No notes yet.
    Notes are stamped with your name, date and time.
  • Q4 | Unanswered

    Are written control measures in place, including temperature monitoring, flushing, and descaling schedules?

    Supporting Notes
    No notes yet.
    Notes are stamped with your name, date and time.
  • Q5 | Unanswered

    Are hot water temperatures regularly checked and recorded at sentinel outlets (e.g., taps and showers)?

    Supporting Notes
    No notes yet.
    Notes are stamped with your name, date and time.
  • Q6 | Unanswered

    Is the hot water consistently stored above 60°C and distributed at a minimum of 50°C at outlets?

    Supporting Notes
    No notes yet.
    Notes are stamped with your name, date and time.
  • Q7 | Unanswered

    Are cold water temperatures monitored to ensure they remain below 20°C within two minutes of flow?

    Supporting Notes
    No notes yet.
    Notes are stamped with your name, date and time.
  • Q8 | Unanswered

    Are infrequently used outlets (e.g., en suite sinks, showers in unused rooms) flushed weekly to prevent stagnation?

    Supporting Notes
    No notes yet.
    Notes are stamped with your name, date and time.
  • Q9 | Unanswered

    Are all shower heads and hoses cleaned, descaled, and disinfected at least quarterly, with records kept?

    Supporting Notes
    No notes yet.
    Notes are stamped with your name, date and time.
  • Q10 | Unanswered

    Is the cold-water storage tank regularly inspected for cleanliness, proper cover, insulation, and signs of contamination?

    Supporting Notes
    No notes yet.
    Notes are stamped with your name, date and time.
  • Q11 | Unanswered

    Are thermostatic mixer valves (TMVs) maintained to ensure appropriate temperature control and reduce scald risk?

    Supporting Notes
    No notes yet.
    Notes are stamped with your name, date and time.
  • Q12 | Unanswered

    Is the water system schematic diagram (layout of tanks, pipes, outlets) available and up to date?

    Supporting Notes
    No notes yet.
    Notes are stamped with your name, date and time.
  • Q13 | Unanswered

    Is there a logbook or digital system to record all temperature checks, flushing, maintenance, and cleaning tasks?

    Supporting Notes
    No notes yet.
    Notes are stamped with your name, date and time.
  • Q14 | Unanswered

    Are external contractors (if used) qualified and providing documented proof of works completed (e.g., calibration, inspection, water sampling)?

    Supporting Notes
    No notes yet.
    Notes are stamped with your name, date and time.
  • Q15 | Unanswered

    Are records kept for at least five years in line with HSE guidance (e.g., ACOP L8, HSG274 Part 2)?

    Supporting Notes
    No notes yet.
    Notes are stamped with your name, date and time.
  • Q16 | Unanswered

    Are water sampling and microbiological testing conducted where required due to higher risk or identified issues?

    Supporting Notes
    No notes yet.
    Notes are stamped with your name, date and time.
  • Q17 | Unanswered

    Is risk from aerosol-producing equipment (e.g., showers, whirlpool baths, spa equipment) assessed and controlled?

    Supporting Notes
    No notes yet.
    Notes are stamped with your name, date and time.
  • Q18 | Unanswered

    Are hot and cold water outlets checked at point of use, especially in areas serving vulnerable residents (e.g., low immunity, respiratory conditions)?

    Supporting Notes
    No notes yet.
    Notes are stamped with your name, date and time.
  • Q19 | Unanswered

    Is water system maintenance included in the premises’ Planned Preventative Maintenance (PPM) schedule?

    Supporting Notes
    No notes yet.
    Notes are stamped with your name, date and time.
  • Q20 | Unanswered

    Are all areas, including staff rooms, kitchens, laundry, sluice rooms, and storage spaces, included in the checks?

    Supporting Notes
    No notes yet.
    Notes are stamped with your name, date and time.
  • Q21 | Unanswered

    Are control measures adapted for vacant rooms or areas to prevent water stagnation (e.g., flushing protocols)?

    Supporting Notes
    No notes yet.
    Notes are stamped with your name, date and time.
  • Q22 | Unanswered

    Are staff aware of the signs and risks of Legionnaires’ disease and how to report concerns?

    Supporting Notes
    No notes yet.
    Notes are stamped with your name, date and time.
  • Q23 | Unanswered

    Is there a contingency plan in place in case of a Legionella outbreak or water system failure?

    Supporting Notes
    No notes yet.
    Notes are stamped with your name, date and time.
  • Q24 | Unanswered

    Is any refurbishment or plumbing work reviewed to ensure it does not increase Legionella risk (e.g., dead legs, cross-connections)?

    Supporting Notes
    No notes yet.
    Notes are stamped with your name, date and time.
  • Q25 | Unanswered

    Are residents, staff, and visitors protected from scalding through appropriate use of temperature-limiting devices or safe design?

    Supporting Notes
    No notes yet.
    Notes are stamped with your name, date and time.
  • Q26 | Unanswered

    Are audits of Legionella compliance undertaken internally or externally and used to inform safety improvements?

    Supporting Notes
    No notes yet.
    Notes are stamped with your name, date and time.
  • Q27 | Unanswered

    Are any Legionella incidents, near misses, or water contamination concerns investigated and acted on promptly?

    Supporting Notes
    No notes yet.
    Notes are stamped with your name, date and time.
  • Q28 | Unanswered

    Is evidence of compliance available and accessible for inspection (e.g., during CQC, HSE, or Environmental Health reviews)?

    Supporting Notes
    No notes yet.
    Notes are stamped with your name, date and time.
  • Q29 | Unanswered

    Are relevant policies (e.g., Legionella, water safety, infection control) aligned and cross-referenced for consistency?

    Supporting Notes
    No notes yet.
    Notes are stamped with your name, date and time.
  • Q30 | Unanswered

    Are changes in occupancy (e.g., resident admission/discharge, room rotation) factored into flushing and monitoring routines?

    Supporting Notes
    No notes yet.
    Notes are stamped with your name, date and time.
  • Q31 | Unanswered

    Is there collaboration with property management (if leased) or landlords to ensure shared water systems are maintained to required standards?

    Supporting Notes
    No notes yet.
    Notes are stamped with your name, date and time.

Your score and completion will update instantly.